You can determine which workloads are ready for the cloud by conducting a Cloud Readiness Assessment.
Schedule a Cloud Readiness Assessment · Cloud Migration at SUE
Cloud Migration It involves moving applications, data, and infrastructure from your own data center to a cloud platform, or from one cloud to another. It delivers scale and speed, but not automatically lower costs: Gartner expects that by 2028, a quarter of organizations will be highly dissatisfied with their cloud adoption. Migrations succeed when you determine for each workload whether and how it will be moved, first set up a Landing Zone, migrate in waves, and manage costs after going live. Increasingly, this also involves an exit plan.
Why are you migrating? Cost, scale, AI, a data center nearing the end of its life, or VMware: the goal determines everything else. → Section 2
Which workloads will be moved, and which will remain? → Section 4
Which cloud? Hyperscaler, European cloud, private cloud, or a mix. → Section 5
Which approach should be taken for each workload? From migrating as-is to rebuilding. → Section 6
How do you keep it manageable afterward? With a Landing Zone, FinOps, security, and an exit plan. → Sections 7, 10, and 11
Cloud Migration It involves moving applications, data, and infrastructure to a cloud platform. This typically involves moving from a company’s own data center or colocation facility to a public cloud such as AWS, Microsoft Azure, or Google Cloud. It can also involve moving from one cloud to another, or back to an on-premises environment. The latter is called repatriation.
Cloud Migration is different from application modernization. With migration, you change where an application runs; with modernization, you change the application itself. Many projects combine the two: first migrate, then modernize each application, or vice versa. You can read about how to decide which approach to take for each application in the guide at Application Modernization.
Yet the reality is often disappointing. Gartner expects that by 2028, 25% of organizations will be highly dissatisfied with their cloud adoption, and that by 2029, more than half will fail to achieve the expected results from multicloud. The causes are almost always the same: migrating everything one-to-one and running capacity 24/7, not assigning ownership of the costs to anyone, setting up the infrastructure after the fact, and forgetting about outbound data traffic and licenses. Section 12 shows how to prevent this.
| Model | What It Is | Goes well with |
|---|---|---|
| Public cloud | A provider's infrastructure and services—you pay based on usage | Fluctuating workload, rapid growth, managed services |
| Private cloud | A cloud platform for a single organization, either in its own data center or with a hosting provider | Constant load, strict requirements regarding location or monitoring |
| Hybrid cloud | Public and private clouds integrated, with shared identities, networking, and management | Most medium-sized and large organizations |
| Multicloud | Multiple public clouds running side by side | Specific services by cloud, distribution of dependencies |
In practice, hybrid is the norm: Gartner predicted in 2024 that 90% of organizations would be using a hybrid cloud by 2027. Multicloud requires more expertise and management than it appears. Choose it for a specific reason, such as a service offered by only one provider. As a general safeguard against lock-in, it is expensive. The difference between hybrid and multicloud is also explained in the frequently asked questions.
Start by taking inventory of applications, dependencies, usage, licenses, and owners. Then, for each workload, assess the following:
| Characteristic | Advocates for the cloud | Argues in favor of staying (or later) |
|---|---|---|
| Tax | Variable, with peaks | Consistent and predictable |
| Service Life | Will continue to be used and developed for years to come | Will be replaced soon |
| Licenses | Bring your own license, or use a SaaS alternative | More expensive in the cloud, or not allowed |
| Latency and Location | Users and links are already in the cloud | Strict latency requirements for machines, factories, or labs |
| Data | Manageable volume, low outbound traffic | Very large datasets with a high volume of outbound traffic |
| Compliance | Requirements Met in the Selected Cloud and Region | Data must not be transferred outside the organization's control or jurisdiction |
Start with workloads that have few dependencies and aren't business-critical. That way, your team can get familiar with the new environment before the heavy-duty systems are migrated.
That choice has changed over the past two years. Digital sovereignty is now on the agenda of executives and regulators, and Gartner expects European spending on sovereign cloud IaaS to rise by 83% to $12.6 billion by 2026. In July 2026, the Dutch government tightened its cloud policy: anyone using the public cloud must justify the risks and dependence on a single provider and have an exit plan. For critical tasks, the government advises against using providers subject to non-European legislation.
You make that decision on a per-dataset basis. A lot of data can remain with a hyperscaler in a European region, with encryption using your own keys and solid contracts. The most sensitive data requires a European or on-premises environment. A Data Sovereignty Assessment can map this out in a week.
For each workload, you choose a path. Rehosting (lift-and-shift) is the fastest option, but rarely results in cost savings in the cloud. Replatforming and refactoring make better use of the cloud, but require more work.
All seven routes, along with a table and a decision matrix, are included in the guide at Application Modernization.
Do you need to act quickly— due to a data center exit or an expiring contract? Then rehost or relocate first, and then modernize.
Does the application run 24/7 at a constant load? If so, be sure to carefully calculate the cost of rehosting: without rightsizing and reservations, the cloud is often more expensive.
Will the application be phased out within two years? Keep it as is or replace it with SaaS.
A Landing Zone is a pre-configured base in the cloud: account structure, identities and roles, network, central logging, security settings, and cost guardrails. Set it up before migrating your first workload. Doing it afterward costs much more, because you’ll have to migrate existing workloads without interrupting them.
Learn more about SUE's approach on the Landing Zone page.
Migrate in waves, not all at once. Each wave teaches your team something for the next one, and having a fallback plan for each wave keeps the risk low.
Determine the goal and the constraints: why you are migrating, what the budget is, and what requirements apply.
Take inventory of applications, dependencies, usage, and costs. Discovery tools are helpful, but discussions with application owners are essential.
For each workload, select a target platform and a migration path, and develop the business case.
Set up the Landing Zone.
Migrate a pilot: a single workload with few dependencies.
Migrate in waves of similar workloads, with a roadmap, a test plan, and a fallback scenario for each wave.
Do not shut down the old environment until the new one is running stably.
Optimize: rightsizing, reservations or savings plans, autoscaling, and removing what is no longer in use.
Since Broadcom’s acquisition of VMware, the licensing terms have changed, and many organizations are looking for an alternative. vSphere 8 and ESXi 8 will be supported through October 11, 2027. Gartner expects that by 2028, more than one-third of VMware workloads will be running on a different platform, and warns that a complete migration will take three years or longer.
Start with the applications you were already planning to modernize and migrate the rest in phases. At NXP, SUE chose Apache CloudStack, which reduced virtualization costs and provided strategic flexibility. Linux alternatives to vSphere are covered in the guide on choosing a Linux distribution, and virtualization on Kubernetes is covered in the guide on Kubernetes.
| Cost item | What's Inside |
|---|---|
| Migration | Assessment, Landing Zone, migration work, tests, and a period during which you pay for both the old and the new |
| Cloud Usage | Compute, storage, networking, and outbound data traffic; managed services and support |
| Licenses | Software you transfer or repurchase; some cloud-based licenses are more expensive |
| Management | Platform management, security, monitoring, and FinOps—handled by your own team or a partner |
| Revenues | No more data centers or hardware to manage, less administrative work, faster rollouts |
Plan for three to five years and factor in the costs of doing nothing, such as hardware replacement or a VMware renewal. For larger migrations to AWS, the AWS Migration Acceleration Program can cover a portion of the migration costs. After the migration, FinOps determines whether the business case pays off: at Colect, a three-day analysis resulted in a 43% reduction in monthly AWS costs. Learn more in the guide on reducing cloud costs.
A migration shifts responsibilities, but it doesn't eliminate them. Therefore, manage security and compliance in the Landing Zone, and determine how you will exit before the migration.
Shared responsibility. The provider secures the cloud itself; you secure what you put in it: identities, configurations, data, and applications. Learn more in the guide to cloud security.
The Cybersecurity Act (NIS2). As of August 15, 2026, organizations subject to this law must assess their suppliers and supply chain risks. This includes your cloud provider and migration partner.
DORA. As of January 17, 2025, financial institutions must manage their IT risks and third parties, including an exit strategy for critical services.
Exit strategy. Document how you will transition if a provider becomes unavailable or the terms and conditions change. Data export, Infrastructure as Code, containers, and open standards keep you flexible. The government’s cloud policy now requires this for key cloud services.
| Cause | How to Prevent It |
|---|---|
| Unknown dependencies | Assess the situation using tools and interviews, and launch a pilot |
| Move everything one-on-one | One path per workload; rehost only where speed matters |
| No one is responsible for the costs | Tags and budgets from the Landing Zone, and a consistent FinOps rhythm |
| All at once (Big Bang) | Waves with a fallback scenario |
| Team not included | Knowledge Transfer and Training Throughout the Process |
| Security After the Fact | Guardrails and logging in the Landing Zone, before the first workload |
The terms are often used interchangeably. Cloud transition usually refers to the broader change: not just the technology, but also processes, management, costs, and your team’s expertise. Cloud Migration refers to the migration of applications, data, and the infrastructure itself.
A standalone application can be migrated in a few weeks. A data center with hundreds of servers is migrated in phases, often spread out over a year or longer. Gartner estimates that a complete migration from VMware will take three years or more. A thorough assessment beforehand ensures reliable planning.
Not necessarily. Workloads with fluctuating demand are often cheaper in the cloud, while workloads that run 24/7 at a constant load are sometimes more expensive. The difference lies in rightsizing, reservations, shutting down what you’re not using, and factoring in management and hardware replacement costs.
Moving workloads back from the public cloud to an in-house data center or private cloud. Organizations do this for reasons of cost, sovereignty, or performance. Just as with migration, you make that decision on a per-workload basis: if something works well in the cloud, you leave it there.
Well-known European providers include STACKIT, OVHcloud, IONOS, and Scaleway. In addition, hyperscalers offer sovereign options, such as the AWS European Sovereign Cloud. A European provider operates under European jurisdiction but offers fewer managed services and less tooling. You choose based on each dataset.
You can determine which workloads are ready for the cloud by conducting a Cloud Readiness Assessment.
Schedule a Cloud Readiness Assessment · Cloud Migration at SUE
You can determine which workloads are ready for the cloud by conducting a Cloud Readiness Assessment.
Schedule a Cloud Readiness Assessment · Cloud Migration at SUE
* required